Term 11 Plan (18.05.23 - 02.06.23)

1. Current WG composition:

2. Planned WG budget:

Planned spending: up to 89,180 JOY

Comment: Details can be found in the funding proposal

3. Term OKRs:

No. Objectives Key Results Initiatives
1 Prepare guidelines for minimal server requirements 1) Page in Notion created with minimal server requirement for DWG 1) Figure out values that make sense. 2) Create Notion page
2 Improve geographical distribution of distribution nodes 1) Geographical spread of nodes is better matching the actual usage of the system. 1) Prepare plan of where new nodes are needed. 2) Contact workers to figure out who could move their servers. 3) Execute
3 Clean up distribution families/buckets setup 1) All the families<->buckets<->operators make sense and
represent reality. 1) Write down all the
current location<->family associations. 2) Figure out if the list
makes sense. 3) If not, come up with a plan on how to update it.
4 Improve monitoring 1) Additional monitoring available for total node availability (including bucket being disabled) 1) Write a small tool to ping all the operators and collect stats from QN. 2) Deploy

Comment for No. 3: This has been planned for the last two terms as well, but no work was started, since I think it should be done alongside work in No. 2.


Term 11 Report (18.05.23 - 02.06.23)

1. Current WG composition: