Council Period Scoring
Motivation
- Allow Jsgenesis to update the Council Period Parameters and network-performance-score metrics for the next period based on up to date and accurate information.
- Allow the possible next council to have good information about the most urgent matters and status of the network.
Scope
- Accounting of how much was spent on what.
- Actual hires made.
- Actual firings done.
- Spending proposals passed.
- Changes made to the notion board.
- A summary on how well the network as a whole performed, and what problems occurred.
- Recommendations for what should be focused on in next council period in order to make the network more effective.
- Feedback on the Council Period Parameters during their term.
Submission
The report itself must be written as a markdown document in English, in the forum category Testnet>Council>Summaries
, as a thread which has the title which includes the council period ID. The council must pass a text proposal (add link when proposal list is in) which references the report on the forum.
If there is a need to link to extra information, statistics, etc. these should be in the notion board.